Dry hanging wall construction plan
来源:南昌工装公司|南昌商业空间设计-泓乔装饰 日期:2016-09-07 13:27
-
Dry hanging metope process:
-
Clear structure and surface structure on the vertical line - big hanging two vertical wire - site receiving to hang a horizontal position, stone sawing slot to brush glue to stick on the back of the flexible strengthening material, the bottom plate bracket to the bottom plate is placed in the positioning, adjusting and temporary fixed - filling and M20 structure of cement mortar to set a drain, drilling and insert the retaining bolt to set fixed stainless steel pieces, filled with adhesive on the lower wall plate hole to insert connection steel needle, the adhesive into the upper wall of hole to temporary fixed upper wall plate, drilling insert bolts to set fixed stainless steel pieces, with the top panel to panel joint sealant, facing the scrub brush layer covering agent - completion inspection and acceptance